Module 5 - Section 4 选项类Summary - Exercise 19

Module 5 - Section 4 选项类Summary
返回主页

练习说明

Questions 36-40
Complete the summary using the list of phrases, A.H, below.
Write the correct letter, A-H, in boxes 36-40 on your answer sheet.

原文

One of the most damaging acts after Utzon's departure was to dramatically change the brief he had been given. The major hall, which under the original brief was to be dual-purpose, both a concert hall for symphony orchestra and an opera theatre, was changed to accommodate only the former. At the same time, the number of seats in it was increased. Opera was shunted off to the minor hall, which was originally intended for drama only, because in the mid-1960s fewer people in Sydney attended the opera than attended symphony orchestra performances. Even though it was an opera house, the government decided, with no forward thinking at all, to put greater emphasis on the concert hall, to the detriment of opera.

The problems with the interiors of the Sydney Opera House are notorious. No grand opera, such as Verdi's Aida, can be properly staged in the concert hall (the major hall) because it has no staging gear. Nor can such operas be staged in the opera theatre itself (the minor hall), because it's too small, Moreover the minor hall can accommodate ballet, but the dancers are put at risk, Performers are forced to runoff into wings that barely exist, and as a result injuries have been common. Similarly, the inadequate dimensions of the orchestra pit have led to musicians suffering hearing loss.

Many people believed that the sound in the concert hall remained inferior, despite many ad hoc fix-ups, including, early on, the installation of 18 huge acrylic ceiling rings designed to reflect sound back onto the stage so that the orchestra could hear itself perform.

选项

Aaudience capacity
Blarger dimensions
Cinsufficient planning
Dinadequate equipment
Etwo uses
Flimited space
Gfinancial incentives
Hacoustic devices
Problems with the interior
第 36 题
After Utzon left the project, the new architectural team was given different instructions Initially the concert hall was meant to have _____, but this was changed to favour orchestral performances. Also, the team was instructed to increase the ____ . This decision to give the highest priority to the concert hall was made with ____AS are result, the interiors of the Opera House are extremely problematic. For example, operas cannot be performed in the opera theatre due to ____ and ballet dancers face hazards when exiting the stage for the same reason, Musicians also experience difficulties when performing and the addition of ____failed to solve this problem.
第 37 题
After Utzon left the project, the new architectural team was given different instructions Initially the concert hall was meant to have ____, but this was changed to favour orchestral performances. Also, the team was instructed to increase the _____ . This decision to give the highest priority to the concert hall was made with ____AS are result, the interiors of the Opera House are extremely problematic. For example, operas cannot be performed in the opera theatre due to ____ and ballet dancers face hazards when exiting the stage for the same reason, Musicians also experience difficulties when performing and the addition of ____failed to solve this problem.
第 38 题
After Utzon left the project, the new architectural team was given different instructions Initially the concert hall was meant to have ____, but this was changed to favour orchestral performances. Also, the team was instructed to increase the ____ . This decision to give the highest priority to the concert hall was made with _____AS are result, the interiors of the Opera House are extremely problematic. For example, operas cannot be performed in the opera theatre due to ____ and ballet dancers face hazards when exiting the stage for the same reason, Musicians also experience difficulties when performing and the addition of ____failed to solve this problem.
第 39 题
After Utzon left the project, the new architectural team was given different instructions Initially the concert hall was meant to have ____, but this was changed to favour orchestral performances. Also, the team was instructed to increase the ____ . This decision to give the highest priority to the concert hall was made with ____AS are result, the interiors of the Opera House are extremely problematic. For example, operas cannot be performed in the opera theatre due to _____ and ballet dancers face hazards when exiting the stage for the same reason, Musicians also experience difficulties when performing and the addition of ____failed to solve this problem.
第 40 题
After Utzon left the project, the new architectural team was given different instructions Initially the concert hall was meant to have ____, but this was changed to favour orchestral performances. Also, the team was instructed to increase the ____ . This decision to give the highest priority to the concert hall was made with ____AS are result, the interiors of the Opera House are extremely problematic. For example, operas cannot be performed in the opera theatre due to ____ and ballet dancers face hazards when exiting the stage for the same reason, Musicians also experience difficulties when performing and the addition of _____failed to solve this problem.
得分: